-
Capturing uploading timestamp in a line item in module
There is a requirement where, when we are importing data in a module, the current timestamp when the file is uploaded in the module should capture that time in line item?
-
problem in import from module to another module ( both contains the same numbered list )
I want to import from module to another module when dimentions of the both of them is a numbered list . during importing mapping is incorrect ( numbered list item can not be mapped correctly)
-
How to Get Current User and Time stamp In anaplan
How to get the current user for a line item and is there a way to get the time stamp
-
List vs Dimention
What's the purpose of storing a value in the dimensions instead of line items? Adding it into the dimensions just explode the model's size. Is there a difference when it comes to create visualization too?
-
In a module a data value is getting overlapped by an unknown action. I am unable to find that action
I am working on a model where a data integration happens in every 4 hour and that loads multiple data in a module. Now for one of the line items and for one particular account the data is getting overlapped and in some data integration that data is not loading correctly. However as per the action responsible for that data…
-
Concurrent changes by multiple builders in ALM models
Hi all. We have multiple model builders working in the same model at the same time. One person's changes might be ready to be sync'd to live while the other person's changes might not be. Does anyone have tips on good governance that can be put in place to help us control this in a better way? Currently we end up with…
-
4.8.2 Activity: Import Data into E2 Employees# List.
4.8.2 Activity: Import Data into E2 Employees# List. How will we fill this place?
-
Model sync error due to time scale and time summary
Hi all, I would really appreciate your help with a weird error. I'm trying to synchronize changes I made in my development model to my production model, but I'm getting the attached error. I did make changes to timescale and time summary, not brought forward property. What puzzles me is that I get this error while the…
-
Delete from list using selection
Hello Everyone, I have a module dimensionned by two lists, in which I added a boolean "Delete" which is codded by true, and I wanted to create a delete from one of the two lists using selection in the "Action" table, based on that boolean, but when I look for it I don't find it in the droplist of "selected using", which is…
-
WORKSPACE SUB DIVISION
We have a single workspace running multiple models. We want to sub divide the workspace so that we have a small area for purely training/experiement models and a much larger one for developmen/production models. The vision is we would run with different user lists in each area,for example. Once sub divided each workspace…
-
Level 2 Conclusion OTH01 Non Employee Expenses
Hello I'm on Level 2 Model Building: Conclusion, and it says: Import the Shipping Cost data from the Supply Chain model into the OTH01 Non Employee Expenses module, Shipping Cost line item. For department, import into the Sales department. Run the import. Results should have none ignored and 0 errors. Here is my saved view…
-
Level 2 Sprint 3 : AD02 Inventory Ordering Overrides
Hello, I am inLevel 2 Sprint 3 I have the following formula for the boolean line items in AD02. For the line : Override Amount - Write? My formula is : IF 'INV01 Inventory Ordering'.Submit Purchase Order Request? AND 'INV01 Inventory Ordering'.Override Suggested Order Amount? THEN TRUE ELSE FALSE Can anyone correcte my…
-
Dimentionality of a model
How is the dimension determined for a model? Here is a high level description and issue i am facing. Module (1) I have a list of entries considered the column looks like this (let's say 10 columns) Dimension ABCDE Metrics FGHIJ The cell count is 66,807,426 And Let's say column E is the project id which could be mapped with…
-
Cost center as Time dependent dimension
Hello, Our client has been working with a cost center structure that is going to change totally. We would like to keep historical data with the old structure for the reporting view. Is it possible in Anaplan to indicate that a dimension is time dependent so that we can ensure to keep historical data and update the new…
-
How to turn on file upload toggle on classic dashboard or NUX.
I have created and import action of users through CSV file but unable to find same toggle in classic dashboard action to upload a new file and run action again to update my user list.
-
Syncing Issue From Dev model to Live model
Hi all, I am having some issue on Numbered List syncing from DEV to LIVE correctly. I have a saved view used for import to create a numbered list in the DEV marked as a production List. When synced to LIVE model it works but the Mapping source does not map correctly in the LIVE. Does anyone know what the issue might be and…
-
Lookup of a boolean line item using top level (parent) not producing results
Hi. I have a multi-dimension module. I created a filter line item that checks to see if a value in Devices dimension is <0 for any one of these devices. I set the sum method to Any, Time: None. So I get the expected result: The formula for this: 'Deployment (LIS)' < 0, and the results work perfectly as expected. Next I…
-
Organizational reporting structure in Anaplan: Seeking Input and Insights
Hello, I work at a company's headquarters, where we use Anaplan applications for reporting purposes. Some of these Anaplan models have been developed in-house, while others have been created by external consultants. This has resulted in a situation where we have multiple lists containing more or less identical…
-
Data Hub to Spoke Model Line Items or Subset
I am building a data hub and spoke models. Currently, I have: built a data hub with system shared lists. It holds flat lists that only consist of list items and list codes. used modules in the data hub to assign line items which act as parents, grandparents and other metadata to the flat lists. saved specific views to pull…
-
NPV with rolling start date
Hi - I am trying to build a module with an NPV calculation which in each month calculates the NPV of cashflows starting from the next month until the last time period in the module. So in Jan-24 it would calculate the NPV with cashflows from Feb-24 to the end of the module. Then in Feb-24 it would calculate the NPV from…