-
Re: Updating production list to non-production list
Hi @anand.shekhawat @Ankit_Negi If both Dev and Prod (Deployed) model are originally Structural list, then changing the list to Production Data will NOT RESULT IN DATA LOSS. However, if both Dev and …1 -
Re: How to Convert Number into Weekly format?
Hi, A date or text can be converted to a week as shown below: Regarding your specific example of converting P1 2018 to Week 1 2018, is P1 2018 a list member or a time from a data file? Perhaps the ex…2 -
Re: Top down allocation
Hi, Let me see if i understand your requirement. You want to enter macro-economic demand % at Region (Parent level) and the same % should be referred by its children. Note that i have replaced "…1 -
Re: Long date format
Hi KT, You can combine the following formulas into 1 line item if you like. But i would believe the single "Day" line item where the formula = weekday(date) should be enough to inform the u…1 -
Re: Past 90 day functionality
Hi ckryan, At the moment, Anaplan doesn't have a standard function that gives you the current or today's date. However you can use integration or data loading to load today's date into Anaplan. Assum…1