Hi team,The Synchronize scroll function allows you to group only up to 4 grids on a page. What are the solutions if you need to apply Synchronize scroll for 5 or 6 grids in one row on a page?
Thanks
Hi everyone!
I can't see any point to have this limitation at all
It would be better to have an ability to create 6 tables synchronized vertically.
But we have a case where it would be better to synchronize 9 tables horizontally.
Looking forward for extension or removal of this limitation!
Thanks,
Kostya
Anaplan, has anyone looked / addressed this issue?
i agree with previous contributors, more than 4 grids would be very helpful
Nick
Hi everyone 👋 If you build or maintain Anaplan models, you've probably hit the same walls I kept hitting. Some basic questions about a model's structure have no single screen to answer them. You end up clicking through modules and pages one by one, or writing API scripts just to get a list. These were the gaps that…
Hi Everyone, We have a requirement in Anaplan Consolidation & Reporting (Fluence) where the Entity Structure needs to change effective January 2026. The key requirement is that the existing entity structure should continue to be applicable for all reporting and consolidation periods through December 2025, while the new…
We've been building a tool called aplan4sheets and we'd genuinely like input from this community — both on what we've built so far and on what we should prioritize next. The problem we set out to solve: Anaplan's Excel add-in is Windows-centric, and there's no real native way to pivot Anaplan data in Google Sheets. We…