A integration flow which usually runs between few seconds to 1 minute is now taking 30 mins and still running, whereas in model there is no tasks running. Can we stop/**** the integration flow without hampering the model?
Can an integration admin not terminate the process in the CloudWorks tab then restore the model to before the process was run?
@josephwood : Thanks a lot for answering, but is the restoring the model necessary?
Depends on the process and what actions had been completed prior to cancelling. It won't undo what has already been imported before cancelling.
Hi everyone 👋 If you build or maintain Anaplan models, you've probably hit the same walls I kept hitting. Some basic questions about a model's structure have no single screen to answer them. You end up clicking through modules and pages one by one, or writing API scripts just to get a list. These were the gaps that…
Hi Everyone, We have a requirement in Anaplan Consolidation & Reporting (Fluence) where the Entity Structure needs to change effective January 2026. The key requirement is that the existing entity structure should continue to be applicable for all reporting and consolidation periods through December 2025, while the new…
We've been building a tool called aplan4sheets and we'd genuinely like input from this community — both on what we've built so far and on what we should prioritize next. The problem we set out to solve: Anaplan's Excel add-in is Windows-centric, and there's no real native way to pivot Anaplan data in Google Sheets. We…