Is there any other method of enabling summarize function in anaplan?

Keerthana99
edited August 2023 in Modeling

Trying to figure out how to enable the summarize function. As the module does not have a time dimension changing it on blueprint view is not possible. I'm trying not to use the sum formula either. Can someone help me out and suggest any other way?

Best Answer