What to do in this situation?Shown in attached screenshot.
Clear space in your workspace. If there is unwanted models are present in workspace then archive it. Also remove unwanted modules, list from model. Follow model optimization checklist.
@aishwary2003
You can try turning off Summary for line items, where not required, remove line items that are not being used, identify line items with more dimensions than required, club the calculations from multiple line items in single line item in case of large modules.
https://community.anaplan.com/categories/Model-Optimization-Checklist/
@aishwary2003 - This error occurs when syncing your QA/Prod model and it will exceed the workspace limit after the changes are promoted to higher environment.
To avoid such issues, you can refer the model optimisation checklist link given above.
Hi everyone 👋 If you build or maintain Anaplan models, you've probably hit the same walls I kept hitting. Some basic questions about a model's structure have no single screen to answer them. You end up clicking through modules and pages one by one, or writing API scripts just to get a list. These were the gaps that…
Hi Everyone, We have a requirement in Anaplan Consolidation & Reporting (Fluence) where the Entity Structure needs to change effective January 2026. The key requirement is that the existing entity structure should continue to be applicable for all reporting and consolidation periods through December 2025, while the new…
We've been building a tool called aplan4sheets and we'd genuinely like input from this community — both on what we've built so far and on what we should prioritize next. The problem we set out to solve: Anaplan's Excel add-in is Windows-centric, and there's no real native way to pivot Anaplan data in Google Sheets. We…