L1MB 9.2.5

error when im adding 5.00% to Rev04error when im adding 5.00% to Rev04is it a formula there or just type 5.00%

1 ACCEPTED SOLUTION

Accepted Solutions
RavinderB
Regular Contributor

@Yogitha 

 

Hi 

 

This module does not require formulas as described by @JaredDolich 

 

Please follow the instructions to set the module correctly, in the next activity you will need to import the data correctly from the CSV file into the module 

 

Thank you 

 

Ravinder 

 

 

 

 

 

 

 

 

 

 

View solution in original post

2 REPLIES 2
JaredDolich
Moderator

@Yogitha 

Both of those line items should be editable (no formula).

If you want to test the report you can add the percentage values in grid view. These are values you will let your planners enter, so they need to be editable.


Jared Dolich
RavinderB
Regular Contributor

@Yogitha 

 

Hi 

 

This module does not require formulas as described by @JaredDolich 

 

Please follow the instructions to set the module correctly, in the next activity you will need to import the data correctly from the CSV file into the module 

 

Thank you 

 

Ravinder