In terms of responsibility, how does a mature COE differ from a new one?
Based on my experience, I think a mature COE will have a Scrum Master to define the scope and acceptance criteria of the user story. Master Anaplanner/ Solution Architect to design the solution, Model Builders to develop the solution, Product Owner to provide requirements. Go through the articles to bet detailed info about this subject.
There was an ACE event dedicated to this topic: https://community.anaplan.com/categories/ace-june2023
I am attempting to connect to an azure SQL database vis at the MSSQL connector in data orchestrator but am having issues and I believe it is due to hyphens in database name (which is a fairly standard naming convention I will note!) Example below (fake credentials) - has anyone else encountered similar and is there a way…
Hi, for some reason my shipping costs are the same over every month and I don't know what to do to fix it.
Hello folks, Does anyone know how to work around the Polaris limitation of using the Formula or Ratio summary method alongside the Closing Balance within the same line item? I have a Business Unit list where the total (All BUs) must display the Corporate (1 of 20 leaf items under All BUs total) number of Unique Customers.…