Is thier a way to limit the years that is available for selection when using the format line item as date?
Although I don't see an out of the box way to do this, you could create a date list that is time-limited as needed.
For example, it might be a 2-list hierarchy where:
List 1 has 3 levels Year, Month, Week
List 2 has dates
The selected date can easily be convered to a real date.
See attached example.
Paul
Thank you for the insight and quick response
Hi, I currently don't have access to the Anaplan Polaris workspace. Is it acceptable to proceed with the training in the classic workspace, or will this create issues later and prevent me from obtaining Polaris certification? Let me know if you have any insight on this.
I need to flow data from a model DAT01a in PBF Dev to PBF Consol, we use connectors to do this OUT3A and OUT3B Any instructions or tips on how to build or test the data can be flowed through to PBF Consol?
Hi, My values of monthly commission forecast is not matching the Check your build values. Please help to identify where I am wrong. As I have attached screenshots of the blueprint and module grid view. Thanks, Sre Varshaa S