A integration flow which usually runs between few seconds to 1 minute is now taking 30 mins and still running, whereas in model there is no tasks running. Can we stop/**** the integration flow without hampering the model?
Can an integration admin not terminate the process in the CloudWorks tab then restore the model to before the process was run?
@josephwood : Thanks a lot for answering, but is the restoring the model necessary?
Depends on the process and what actions had been completed prior to cancelling. It won't undo what has already been imported before cancelling.
Hi all, The Client ID and Client Secret are available, intended for uploading and downloading files. Could anyone advise how to use these credentials DIRECTLY to make API requests? Thank you!
I have A6 as the parent list and two sibling lists: A6.5 and A7. The A7 list includes an attribute that maps to A6.5. In the UX, the user will select A6.5 using a content selector, and the grid (dimensioned by A7) should display only the A7 items associated with that selected A6.5. Since the selector is a page context andβ¦
A quick reminder of the Bulk Copy functionality. Bulk Copy allows you copy large volumes of data from one slice of a model to another in a single, optimised operation, instead of using formulas or imports. Use case: copy a version (RF1) into a prior year version (PY RF1) using a versions list to allow for year-on-yearβ¦