In terms of responsibility, how does a mature COE differ from a new one?
Based on my experience, I think a mature COE will have a Scrum Master to define the scope and acceptance criteria of the user story. Master Anaplanner/ Solution Architect to design the solution, Model Builders to develop the solution, Product Owner to provide requirements. Go through the articles to bet detailed info about this subject.
There was an ACE event dedicated to this topic: https://community.anaplan.com/categories/ace-june2023
There was an error rendering this rich post.
Hi all, The Client ID and Client Secret are available, intended for uploading and downloading files. Could anyone advise how to use these credentials DIRECTLY to make API requests? Thank you!
I have A6 as the parent list and two sibling lists: A6.5 and A7. The A7 list includes an attribute that maps to A6.5. In the UX, the user will select A6.5 using a content selector, and the grid (dimensioned by A7) should display only the A7 items associated with that selected A6.5. Since the selector is a page context andβ¦