I need to change Model Calendar Time settings 4 4 5 Structure.
Currently the system is allowing me to use Last Sunday near to the end of month. Ideally my requirement is I need third Sunday / Second Last Sunday near to the end of the month.
For Ex: 28th Oct 2024 to 26th Oct 2025, is Current fiscal year which came because of the the end of fiscal year selection - Last Sunday near to end of October month. (So 27th Oct 2024 is Sunday, So FY is starting from 28th.
Requirement: I want this to start from 21st October 2024 like One week ahead.
Answers
-
Hi @Nagendrans,
The specific calendar you mentioned is not available as a standard option in Anaplan. However, you can create a custom time list.
A custom time list is a flat list that you maintain and use as your time dimension instead of the default Anaplan time. With this flexible approach, you can define your fiscal years, weeks, and other time periods according to your specific requirements.
I hope this helps.
Seyma 🌷🙂