Hi,
I want to ask for help with why while importing, it keeps on reading my code like this xxxxx+12? Attached photos for reference: File: (.csv format)
Anaplan:
Thanks,
In Excel, it autoformat it to this format 4.0201E+12
Change the format to Number in Excel and reupload the csv file in Anaplan.
It will load it in the correct format. Try it out.
@MC This is just how Anaplan represents the number in the preview, the underlying number is not affected.
I am trying to choose between 2 values to use based on a value in another module and lookup to a Cohort from a month value. So, either the Extrapolated Blank Tariff CoS if the Cohort has Flash ticked in Month End Attributes, or Blank Tariff CoS if the Cohort does not have Flash ticked in Month End Attributes. This formulaβ¦
Could not enable filters on UX page. Created Planning period Filter and apply filter on column is disabled. Any help on this
Hi everyone, I am trying to create a connection ADO from PostgreSQL, but I consistently receive the following error: Failed to establish a connection The following message was sent from the target system: The SSL certificate is either invalid or not in unencrypted PEM format. Please check your certificate and try again.β¦