Hi
Can we introduce the option to freeze Grid table totals ?
If we have a long table, need to scroll down every time we need to check Totals.
Thanks
Kudi
I agree and also would like to freeze line items on the module at record level or column level so that we don't have to keep scrolling back to see the data we need.
The freeze pane option is yet to be available, however, there is a new feature to the NUX that has jest been released called synchronized scroll, that allows for similar functionality.
The synchronized scroll feature can be found in the top right corner of a grid card,
Selecting the feature will open up a panel to group the cards with similar dimensionality to be synchronized.
Name the groups accordingly, and then select the Boolean in the right corner of each card that should be in sync.
There is also an option to choose which direction the grids should be synchronized.
In this case, I chose Verticle only, because I have text fields in Grid 1, that I want to "Freeze Panes" so I can move the data left to right, without moving the Values in Grid 2, where I can make inputs, directly referencing the grid on the left.
If I put the mouse cursor in Column A Row 1, and scroll down, you can see the cursor in the column did not move and both grids scrolled vertically to the bottom. This is a very valuable feature provided by the NUX.
The Color Palette under Assets only applies to charts, but it’d be awesome if we could use it for font and text colors in NUX. It’s a bit tricky to remember or copy hex codes every time, and this would make pages so much easier to style and keep on-brand. A small change with a big visual impact!
While the Model Map functionality already exists in Anaplan, it becomes difficult to navigate when working with large models. I would like to see enhanced support for full export capabilities of the model schema (DISCO). This would greatly streamline documentation efforts and save time when capturing model status across…
I'd like to request implementing a formal notification system for upcoming platform changes and updates. This would be incredibly valuable for the Anaplan community for several reasons: Real Impact Example:Recently (Sept 2025), an unannounced Cloudworks change restricted .csv000 file imports. This resulted in: Failed…