Hello
One model has been changed from Deployed to Standard by mistake.
If I re-change from Standard to Deployed, will I be able to sync again from DEV without losing anything?
Thank you
Assuming there were no structural changes made, yes. You should not have an issue.
You could also use the "Revert to last Revision" button if there were changes made in Production to revert back to when the model was compatible with your development instance.
@jasonblinn
thanks a lot for your answer and sorry for the delay of replying. Unfortunately, there were structural changes so not possible.
A nice day
Hello folks, Does anyone know how to work around the Polaris limitation of using the Formula or Ratio summary method alongside the Closing Balance within the same line item? I have a Business Unit list where the total (All BUs) must display the Corporate (1 of 20 leaf items under All BUs total) number of Unique Customers.β¦
Hello community, I have an issue with anaplan report (functionality). The issue I have is within couple of slides. The data in that report is scrolling into a new page. There is a hierarchy in the rows and line items and time in the columns. My problem is, the hierarchy is getting broken in the second page. One of the nodeβ¦
I want to create an S3 connection that will have monthly data stored in individual csv files that is connected to ADO. Around month end, data will be uploaded multiple times, replacing existing csvs. When this happens I want to replace the existing data for that month with the new file. I don't want to have to create aβ¦