Data Copy Model to Model
Hi, I want to copy the data from one deployed model to another deployed model, what would be the best strategy to complete it with using minimum import actions? Thanks, Anmol Sarna
-
NewUX App duplication with page links
Hi! I've created an App in the NewUX base on a Dev model and now I'm duplicating this App and mapping it to the Test model for the user testing. The duplication and re mapping was performed without any issues but the links to other pages that I had in the App are still linked to the pages on the App created based on Dev.…
-
Enhance ALM to pick and choose objects to sync with production
Description of the enhancement required: Enhance ALM to pick and choose objects to sync with production An example of the enhancement: Currently, we are not able to move only few selected changes from development to production. The model sync will move all changes as on a revision tag. Requesting development team to…
-
NUX - Pushing Changes from TEST App pages to PROD App Pages
BACKGROUND: We utilize ALM and have everything built out in Apps for End Users. We have Duplicate Apps for TEST and PROD. PROBLEM: This becomes a pain and time consuming maintaining the changes you make in both TEST and PROD. Currently we have to make a duplicate of each page edited, move it to the new app, then repoint…
-
Automated Email Notifications
Would be great if Anaplan could implement a way for users to configure automatic emails based on user defined criteria. User can also control frequency of automated emails This should work exactly like Smartsheet's automatic email function (see attachment) Examples: 1. Alert me if any new items appear on my name fall under…
-
Ability to Select Workspace When Creating Model from Revision Tag
Current Functionality : When we create a model from Revision Tag it creates the model within the same workspace Idea : Ability to Select the Workspace and creating a model from revision tag in the selected workspace.
-
How to set actions between PROD models (via DEV models)
Hello, I have a question regarding interactions between models and ALM. I have 4 models: Demand DEV, Demand PROD, Supply DEV and Supply PROD, I need to establish a link between the Demand PROD and Supply PROD models. My question is how shall I set the action in the Supply DEV that will then be deployed in the Supply PROD…
-
Managing Anaplan ALM with API using Postman Tool
Hello Team, While am trying to retrieve syncable revision tag from the source model, am facing issue of whose screenshot i have attached below, Reference : I have cross verified the ALM between source and target and also i have verified the Model whether its defined correctly in the environment variable and also checked…
-
Controlling ALM using Anaplan Connect
Hello Team, Is there any batch script/Anaplan Connect script where we can automate the revision Tag Sync of Datahub with Multiple Production Models ?
-
Pro tip: Process & Import IDs
When setting up data integrations the process or import actions are often referred to by name, however, this practice isn't robust and can cause process failures if names are changed in the model. During development and enhancements, a model builder may choose to edit the name of a process or import to the model. This…
-
Enable multiple source models for an app
Hello Community Members, We are trying to move from a multi-app set-up (Dev, Test, Prod) for our UX apps to a single app enable with multiple source models. However, in trying to do that I realized that there's no way I can change this setting at an app level; now I end up needing to make that change in ~ 6*20 pages. Since…
-
Regarding Case: 00485851Reload of Anaplan Add-in Word/Excel/PowerPoint should land user to Home page
Current behavior of add-in is reload option land user to sign in page, which is not a good user experience, as due to current behavior user needs to again do the sign in process in oredr to navigate to Home Page of add-in, As per our suggestion it should be replaced with logic where reload lands user to same page which…
-
Configuration & Release Management System
The Situation I currently help manage a set of models ranging from Dev, Test, & Production. Our Production model is live with close to 700 users. We release changes into production on a 2 week cadence but there are times where a fix must be pushed live immediately patching. Some new features may take longer to develop 2…
-
How is a typical environment setup in Anaplan for SDLC?
I am interested to understand how a typical environment for Software Dev lifecycle needs to be setup in Anaplan? Do we have different workspaces for Dev, Test and Production or is that carried out in a single workspace with models for dev, test and prod. What are the pros and cons for either approaches?
-
Moving Production Model to new workspace
We currently have ALM set up between our DEV -> QA and DEV -> PROD models in our workspace. We have 1 DEV and 2 PROD with the same DEV model. So now the Production workspace is almost full, so we are planning to move one of the PROD model into a new workspace. Please confirm if we will still be able to sync any changes…
-
Application Lifecycle Management for the User Experience
Application Lifecycle Management (ALM) enables your governance, development, and maintenance of Anaplan use cases. You can now work with ALM features in Anaplan’s User Experience (UX) to manage the lifecycle of your pages alongside that of your models. With the UX, you now build pages inside apps. Apps contain all the…
-
Block ALM
Hi Team There are instances where we do not want the production model to be updated using ALM. This is required when we have any model developers working on the same model, and don't want any of them to accidentally move changes to PRO. With this option we are better prepared for risks that may occur for data loss or…
-
Restore model when its in deployed mode
hello team members, I have attached a screenshot where I am getting error to restore my model. I have archived this model and copy archive. Does deployed mode cause any effect?
-
Save incomplete changes when synchronizing in ALM
Imagine this scenario: You are in the middle of making changes in your development model and have been doing so for the last few weeks. The changes are not complete and are not ready to synchronize. However, you just received a request for an urgent fix from the user community that is critical for the forthcoming monthly…
-
Revision Tag: Roles -> Actions
Hello, I have a quick question in regards to revision tags. If I were check the box to grant a user access in "Roles → Actions" in DEV, would that require or qualify to use a Revision Tag in order for it to sync to PROD? Or what would be the best way to update the change, so it reflects in PROD?
-
Testing in Anaplan
Hi Friends, How do we do Unit Testing and System Integration Testing in Anaplan?
-
Import Sources
Hello Anaplan community, There are several notions related to import sources that I have trouble comprehending. These are : Source Labels, Source object, Source model (in Actions) and Source models. I can not understand what each term means, what is the difference between them, how should I manage the import sources in ALM…
-
Model impersistence across pages in the application
Our case: We are separating clients data into different models and manage access via those models administration We have a single application that points to those models and allows users who have access to switch between them (assuming that they would switch between clients data sets) When user switches pages of the…
-
Data Related Training Classes
* Anaplan Connect (301) * Anaplan Data Integration Basics (303) * Creating a JAVA keystore for use with Anaplan Connect Overview This set of classes address how data is used and managed within an Anaplan model: Anaplan Connect (301) Anaplan Connect enables the Anaplan administrator to automate Anaplan imports of data and…
-
ALM - Calculate Model Size
It would greatly improve the Anaplan ALM experience if Anaplan was able to calculate the impact to the model prior to pushing a model sync. "Completing this sync would cause your workspace to exceed its size limit" It is pretty inefficient that model builders are forced to wait to find if completing a sync would exceed a…
-
Top three underappreciated features of the UX
Author: Kait Chura, Certified Master Anaplanner and Solution Architect at LiveRamp. Reflection is a common practice for me when entering a new year. It's important that I find appreciation in both my personal and professional life, so I know what made my year better. Then, I can either build upon good behaviors in the…
-
The New UX should have ALM capabilities for managing changes like the old UX
Hi Anaplan, The New UX currently lacks ALM capability like the old UX does. The benefit of this would be managing updates to apps as you currenly can in the old UX. It would great if the New UX had ALM capabilities like the old UX. Thanks, Usman
-
Fix the Current Period bug in ALM
After a platform update in 2020, updating certain time settings in ALM clears out the current period in production models. I would like to see this issue resolved, or at minimum better notification from the system when pushing a relevant change that it may clear some production settings.
-
What is the difference between Modules and views. can multiple views creation possible in a module?
3.) What is the difference between Modules and views. is it possible to create multiple views for one module.