-
Issues with PlanIQ and Selective Access Enabled on List Hierarchies
Hi Anaplan Community, I am facing an issue when running PlanIQ and selective access. Specifically, I have activated selective access at the G3 Region level, which also applies to G1 and G2 lists. I run PlanIQ at the C3 Region - CARE ID level, but with integration admin and top-level list access provided to the user running…
-
Synchronizing Count on two Item of a List
Hello everyone, I am facing a challenge regarding the following development, I have a module that contains the following dimensions : Time (months) and Cost Center The Cost Center List contains a list of employees followed by a code that caracterize their division group (A1, A2)… There is a case where, here, Peter Williams…
-
Copy Forecast Data from FY26 to FY27
Hello Brains Trust, Question if there is a quick way to copy data from one forecast period to other including comments. example - Copy Full Forecast Data from FY26 to FY27 Cheers
-
Plan IQ - Backtest Date
Hi All, Can anyone provide the details steps to import backtest data in Anaplan? Any suggestions appreciated. Thanks Ashutosh
-
Minimize and Maximize Objective on Optimizer show Same Value
I am looking for Minimal cost for transportation by running Optimizer.. I have Run both Minimize and Maximize Value, but both of them show same Total Cost (Red Rectangular) like picture below, if I compare with Excel (Green Color Fill), Excel can show different total cost result… Am I make a mistake? Minimize Result…
-
How to avoid result negative when running Optimizer
I Want to solve Linier program issue using Anaplan optimizer. I have following all scenario from anapedia. But one of result show negative value like picture (Red Rectangle) Now my question is, how to setting variable result to avoid negative value??? ———————————————————————————————————————— if you curious about Liner…
-
Select Functionality with flat lists?
I have data hub model that is comprised of flat lists and modules that build the hierarchy like in L2MB training. I have Module A dimensioned by 4 flat lists (all with hierarchy module builds) including PR3 Product Name. Previously when I had hierarchal lists, I could have a line item in Module B that references a specific…
-
New Data collection in planIQ if the horizon is updated?
If the horizon for a data collection is changed, is it needed to: re-run the data assembly? retrain the forecast model? Or create a new data collection?
-
SUMをするときに使用するTimeの種別について
TopLevelを持つリストでSUMをするときに、なぜデフォルトのTimeではできないのでしょうか? SUMの条件として指定するTimeだとできない理由は何ですか? (Propertyやカスタムカレンダを作成したTimeの値は使用できました。)
-
PLAN IQ Error|The dimensions in the target module do not match the import definition. - no occurrenc
Hello, I am trying to work with Plan IQ but I keep having this error, that makes no sense to me since I have carefully followed the instructions on how to construct and map the Plan IQ modules. Can some help me identify the problem? Here are the screenshots of the mapping of the forecast results module and the set up Thank…
-
Forecast Action Failed - Line Item identifier(s) were not mapped and ignored
Hello, I'm attempting to run Plan IQ, but the forecast action status is set to fail, with the following description: 1 Line Item identifier(s)…
-
Plan IQ - forecast action failed
Hello, I'm attempting to run Plan IQ, but the forecast action status is set to fail, with the following description: 1 Line Item identifier(s)…
-
Forecast without PlanIQ
Is there an alternative to deliver anual forecasts in Anaplan without PlanIQ?
-
How to obtain annual forecasts?
I'd want to have an annual projection, but Plan IQ only allows for monthly/daily/weekly . Is it feasible to obtain a yearly forecast?
-
Splunk Course Recommendations for Anaplan Intelligence Integration
Hi Anaplan Community, I'm looking for a Splunk course to better integrate it with Anaplan. Any recommendations? Specifically, I need insights on courses covering Splunk fundamentals, advanced search/reporting, Splunk Enterprise Security, and Anaplan integration tips. Thanks!
-
Plan IQ - Import Actions
Recently i have been running a lot of IQ models then attempted import them back into Anaplan. However they often time out after 24 hours and i waste a lot of time. As when i re-run import they work. These are small models which no one else is using. I am only importing one IQ run at a time into the model so it shouldn't be…
-
Anaplan PPT Template
Does anyone have the latest Anaplan Corporate PPT Template? Getting ready for some User Groups, and the one I have is from a number of years ago. I couldn't seem to find it in the "Resources" section.
-
Plan IQ - Prophet Algorithm - End of year Dips
Hi I have been using prophet to do some forecasting and with my item i have a lot of end of year dips around christmas. I know IQ has holidays functionality which i have been using. I have also added a holiday boolean as an explanatory variable to help. But the forecast is still not diminishing enough on these weeks. My…
-
AWS Forecast used by Plan IQ
Regarding the AWS Algorithms that Plan IQ uses. Does AWS improve these over time and make version changes. The reason i ask is that lets i decide an algorithm isnt working for my forecast so i stop using it. But then months later the algorithm is enhanced and becomes more appropriate. How would know?
-
Measuring Forecast Bias at Aggregate Level
Hi, I would like to ask if how can we measure bias at the aggregate level. Do I just use the Total Actual Values vs Total Forecast Values to calculate for the Bias%? If yes, how can it consider possible scenario of offsetting biases at the item-level (e.g., one item has +30% bias, while the other item has -30% bias), if…