-
Copy Forecast Data from FY26 to FY27
Hello Brains Trust, Question if there is a quick way to copy data from one forecast period to other including comments. example - Copy Full Forecast Data from FY26 to FY27 Cheers
-
Issues with PlanIQ and Selective Access Enabled on List Hierarchies
Hi Anaplan Community, I am facing an issue when running PlanIQ and selective access. Specifically, I have activated selective access at the G3 Region level, which also applies to G1 and G2 lists. I run PlanIQ at the C3 Region - CARE ID level, but with integration admin and top-level list access provided to the user running…
-
SUMをするときに使用するTimeの種別について
TopLevelを持つリストでSUMをするときに、なぜデフォルトのTimeではできないのでしょうか? SUMの条件として指定するTimeだとできない理由は何ですか? (Propertyやカスタムカレンダを作成したTimeの値は使用できました。)
-
Minimize and Maximize Objective on Optimizer show Same Value
I am looking for Minimal cost for transportation by running Optimizer.. I have Run both Minimize and Maximize Value, but both of them show same Total Cost (Red Rectangular) like picture below, if I compare with Excel (Green Color Fill), Excel can show different total cost result… Am I make a mistake? Minimize Result…
-
Plan IQ - Backtest Date
Hi All, Can anyone provide the details steps to import backtest data in Anaplan? Any suggestions appreciated. Thanks Ashutosh
-
Synchronizing Count on two Item of a List
Hello everyone, I am facing a challenge regarding the following development, I have a module that contains the following dimensions : Time (months) and Cost Center The Cost Center List contains a list of employees followed by a code that caracterize their division group (A1, A2)… There is a case where, here, Peter Williams…
-
How to avoid result negative when running Optimizer
I Want to solve Linier program issue using Anaplan optimizer. I have following all scenario from anapedia. But one of result show negative value like picture (Red Rectangle) Now my question is, how to setting variable result to avoid negative value??? ———————————————————————————————————————— if you curious about Liner…
-
New Data collection in planIQ if the horizon is updated?
If the horizon for a data collection is changed, is it needed to: re-run the data assembly? retrain the forecast model? Or create a new data collection?
-
Select Functionality with flat lists?
I have data hub model that is comprised of flat lists and modules that build the hierarchy like in L2MB training. I have Module A dimensioned by 4 flat lists (all with hierarchy module builds) including PR3 Product Name. Previously when I had hierarchal lists, I could have a line item in Module B that references a specific…
-
Forecast Action Failed - Line Item identifier(s) were not mapped and ignored
Hello, I'm attempting to run Plan IQ, but the forecast action status is set to fail, with the following description: 1 Line Item identifier(s)…
-
Plan IQ forecast model - is there any way to detour a limit in forecast horizon
Hi I'm new to PlanIQ - I'm curious with simple prediction setting can I make a prediction of, for example, data in 2022 with the historical data of 2020 in planIQ when my forecast horizon is limited? (without setting 24 prediction months & giving more data?) since it has a forecast horizon limit when creating a forecast…
-
Plan IQ - forecast action failed
Hello, I'm attempting to run Plan IQ, but the forecast action status is set to fail, with the following description: 1 Line Item identifier(s)…
-
Plan IQ. Data Collections. Data format
Hi! I have a question in regards to the 1st step of Plan IQ. (I went through Anaplan Plan IQ learning, but still cannot really figure it out) I set up data like in the example, but still it failed. It says: Historical or Related data Time column contains time format that is not recognised. Refer to the Anapedia article…
-
PLAN IQ Error|The dimensions in the target module do not match the import definition. - no occurrenc
Hello, I am trying to work with Plan IQ but I keep having this error, that makes no sense to me since I have carefully followed the instructions on how to construct and map the Plan IQ modules. Can some help me identify the problem? Here are the screenshots of the mapping of the forecast results module and the set up Thank…
-
How to obtain annual forecasts?
I'd want to have an annual projection, but Plan IQ only allows for monthly/daily/weekly . Is it feasible to obtain a yearly forecast?
-
Forecast without PlanIQ
Is there an alternative to deliver anual forecasts in Anaplan without PlanIQ?
-
Splunk Course Recommendations for Anaplan Intelligence Integration
Hi Anaplan Community, I'm looking for a Splunk course to better integrate it with Anaplan. Any recommendations? Specifically, I need insights on courses covering Splunk fundamentals, advanced search/reporting, Splunk Enterprise Security, and Anaplan integration tips. Thanks!
-
How to use “LOOKUP” function in Anaplan: Explanation through an example
Hello Anaplan Community, During my Level-I and Level-II trainings I thought that it would be useful if an explanation with an detailed simulation for use of LOOKUP and SUM functions. There for I prepared a detailed explanation for each functions. Below you can find the explanation with an detailed simulation for use of…
-
Measuring Forecast Bias at Aggregate Level
Hi, I would like to ask if how can we measure bias at the aggregate level. Do I just use the Total Actual Values vs Total Forecast Values to calculate for the Bias%? If yes, how can it consider possible scenario of offsetting biases at the item-level (e.g., one item has +30% bias, while the other item has -30% bias), if…
-
Add a Dimension in Forecasting PlanIQ
Hi, I want to use PlanIQ to forecast the demand of different products over time. I've managed to do so on PlanIQ, but now I would like to be able to forecast the demand of different products, over different countries. Every product exists in every country, and I would like to predict the demand. Therefore what I wanted to…
-
Plan IQ - Import Actions
Recently i have been running a lot of IQ models then attempted import them back into Anaplan. However they often time out after 24 hours and i waste a lot of time. As when i re-run import they work. These are small models which no one else is using. I am only importing one IQ run at a time into the model so it shouldn't be…
-
Anaplan PPT Template
Does anyone have the latest Anaplan Corporate PPT Template? Getting ready for some User Groups, and the one I have is from a number of years ago. I couldn't seem to find it in the "Resources" section.
-
Plan IQ - Prophet Algorithm - End of year Dips
Hi I have been using prophet to do some forecasting and with my item i have a lot of end of year dips around christmas. I know IQ has holidays functionality which i have been using. I have also added a holiday boolean as an explanatory variable to help. But the forecast is still not diminishing enough on these weeks. My…
-
AWS Forecast used by Plan IQ
Regarding the AWS Algorithms that Plan IQ uses. Does AWS improve these over time and make version changes. The reason i ask is that lets i decide an algorithm isnt working for my forecast so i stop using it. But then months later the algorithm is enhanced and becomes more appropriate. How would know?
-
PlanIQ [FCAST-0600: Error: You have exceeded your monthly forecast quota] meaning
Hi everyone, I'm starting to test PlanIQ and got the following error : FCAST-0600: Error: You have exceeded your monthly forecast quota I searched around but wasn't able to find any explanation of this error Doest anyone know what is my monthly Forecast quota ? Is it related to my PlanIQ Forecast model ? (I took 2 years of…
-
IS IT POSSIBLE TO LOCK THE ROLLING FORECAST?
Hi, I would like to know if it is possible to lock or save the rolling forecast for the remaining months of the current year?
-
PlanIQ Calculation
Hi All, I have created some scenarios for PlanIQ & everything is working well. Output file is getting generated as per different algorithm etc. Just wanted to know, what kind of calculation is being performed for these algorithm - I mean what is the calculation matrix for Anaplan AutoML vs Amazon AutoML. Is there a way to…
-
Requirements to prepare a demo of PlanIQ
Hi everybody! I'm new in this forum and in Anaplan. I'd like to know if is possible to prepare a demo of PlanIQ on Anaplan without knowledge of Anaplan or what are the minimum knowledge of Anaplan in order to be able to prepare a Demo of Plan IQ? From the side of PlanIQ itself what are the knowledge pre-requisites in order…
-
Forecasting
Hi expert I want to learn forecasting .Can u guide me regarding this . thanks in advance
-
Team Up Feasibility Calculation by Optimizer
Hi Community, I am working on a simple team member setting model using optimizer but it keeps returning "The problem is infeasible" error. Here is my model: - The module consist of a Nurse List and a Doctor List. It has three line items : Team, Success, and Team Up Constrain. Team - It is the variable for optimizer. In…