-
how to start to use anaplan for end user
-
Performance Comparison - OFFSET/LAG/PREVIOUS/LOOKUP
Hi all, Was looking to get some input on a calculation scenario as community pages were a bit vague (or I'm using the wrong keywords). Now, I'm sure most of us understand how Anaplan thrives on being multi-threaded where possible, but when it comes to performing time-based calculations, there's a variety of ways to do the…
-
Can't access my workspace.
Can anybody tell me if Anaplan Workspace is working or not? Actually I can't see my models from level 1 and 2 anymore. And also I can't access anything. I heard that Anaplan Workspace will again be available after 31st March 2024. Is It True? Can someone please tell me?
-
Error Line item for Assignees in Group Task for Workflow
Hi All, I've been working in Anaplan Workflow, when it comes to group task I am facing with a challenge. I chose a line-item driven assignee method in the Group Task, but I was not able to assign the particular line item for assignees. The error showing in the line item for assignees: "There are no valid line items.…
-
Cell counts vary for the same formula
Hi All, I downloaded the Line items from a model I've been asked to review. On a number of instances there are duplications (ie the same formula copied in a number of modules). an example is where the same line item formula is copied 3 times over: Instance A - 3.2M cells Instance B - 600k cells Instance C - 4k cells So…
-
Module Importing through Connect to anaplan model
Dear Team, I am Pursuing My Level 3 certification, I am not seeking help on Modelling But needed a small hint on the import view. I think I am missing something, I try to find the RCA but unable to solve it. Problem Statement- My import view of the G4T List is not coming as expected. Here for each Territory all account are…
-
Bulk Copy Years
Hello everyone, I would like to move all the data in my model by a few years (Write all data from 2020 to 2023, 2021 to 2024…). For that I tried using Bulk Copy, but I can only copy individual months there, not entire years (if I select this accordingly, the button is greyed out). This is therefore a problem, as some…
-
dimensions look up
I have a REF module dimensioned by a list of vacations: this module represents with a hierarchy, a column of start date and end date. (the "vacation list" is a child of "team"). I have a second module dimensioned by Team, which I'd like to model by day, so that I can boolean-select the days off. I've set a formula of :…
-
Move data between Anaplan & SAP
I am looking for possible & efficient ways which can be used to move data between Anaplan & SAP. In the past i have used SSIS to do same between Anaplan & MS Dynamics365/SQL Server, by using Anaplan API to execute import & export actions. Is there a tool which can give me a similar approach for SAP as well?
-
When to use lookup/sum versus when to refer cells in anaplan
I find a little bit confusing on when we would use the lookup or sum function rather than refer the cells in anaplan. Can you help me to explain more about this? I also note that lookup is for looking up non-repetitive value on the source file, while sum is for summing up repetitive value on the source file. Depending on…
-
delete
-
How to flag SKUs based on the lowest revenue
Hi, I have a module Target Setting with 3 dimensions: Brand, Category, Time. Users make an % input to indicate how much each combination should increase Revenue for the next Year. Then, the Target SKU Reduction line item is calculated within the same module to inform how many SKUs should be discontinued to meet the target…
-
Is there a way to reset the List Ids to reorder it correctly?
Hello everyone, I am building a date range filter to allow a use to select weeks and then have it filter to the days belonging to each week. I did this by having a report days being a child of Report weeks and using an Time calc to set up the range. It is working like I want by showing the correct list items. But they are…
-
Complex GL Account Mapping to Cost Centre for Allocation
Hi Anaplaners, I want to mapp certain GLs to CCs and vice versa. Additionally I want to map certain cost centre to all GL Account and vice versa. Based on the mapping I would input an Allocation % for those mapped GL & CC. The mapping is done on the lowest levels of the hierarchy. It will also have the Parent of the GL…
-
Summing a line item with a formula summary method
Hi I have a module that is calculating correctly for each line item when I apply the Formula summary method as its based on the dimensions listed in the context selectors. I need to return the sum of this line item (highlighted in yellow) in another module but it obviously returns zero. I am sure I am missing something…
-
How do I import only 1 occurrence without errors?
I have a DATA module with a line item named "Scenarios." I need to import this line item into a list also named Scenarios list. The data module is dimensionalized by a different list so I cannot use the isfirstoccurence() formula. What's the best practice when it comes to importing this line item into a list as to not have…
-
How to get Range of Values between two Booleans that are time formatted?
When the user select Two Boolean Check the range is defined so I want to get the range of values respective months.
-
Avoiding circular reference using daily workaround to simulate PREVIOUSITEM() function
I'm working on a tops down attrition allocation model. We want to be able to input an annual attrition number and allocate that down to the lowest level (Month, Country, Segment, Attrition Type, and Tenure). Given that attritions have to be whole numbers I've been using MOD() to carry forward the probability of an…
-
Refresh data hub to Spoke model
Hello, I have two lists on my Datahub. On the Spoke Model, I import these lists through a saved view, and on Apps I have a spoke model refresh page that should import me the changes made on the Datahub app. On the Data Hub App: I can add a line to the list and I can delete it. The problem is that when I refresh my spoke…
-
List to module, most efficient way?
Hi Do anyone know what the best way to link a module to a list is? Cause in our models we keep databases in lists, to be able to keep track of the history. The end useres are uploading a data file, which is then stored in the list, with needed column data saved as properties. My question then goes on what is the best way…
-
I need to add new item to Tree View (General List)
There is no option to enter a name to 4060 item line. Can someone help please?
-
link text-formatted line item
Hi All, I have a question from a partner.., Can you please confirm that it is not possible to link to a file destination in Anaplan using a link text-formatted line item. The link text-formatted line-item defaults to http// and the file destination our client uses has a different prefix using backslashes (\\). The links…
-
Drive dimension selectors from undimensioned module
Hi, Is there a way to drive dimension selectors from a module that has no dimensionality? I have 2 modules: Select Dimensions no dimensionality, just line items that are formatted by dimensions entity and department, etc Income Statement dimensioned by entity and department. End-users would like to make entity and dept…
-
Query on Efficient List Creation Method
I'm seeking advice on the quickest method for creating lists in Anaplan: using the UX Page "Form action" or the backend Actions for Creating List Item. Which approach is more efficient?
-
anaplan level 2 sprint 1 activity 1.5.6.1
Hi all, I have problem while importing data into Historic Volumes Module. The csv source file contains data (image 1), but when I run importing into modules (image2&3), there's no data at all (image 4). What should I do to fix this problem? And by the way, I do not get why we select "Column Headers" for "Volumes". I got…
-
Why is there a round at the end of a number converted from text?
Hello, I am converting a text into a number to do a complex sort. It adds code from several different dimensions to create a large text. Then I convert it using value. When I do this, the final 3 digits are being rounded unnecessarily. Does anyone know how to get past this? Original text: 23921101010004270452 Converted to…
-
How to manage Workflow-Approve/Reject
Hi, I am trying to create workflow for my project. My module has product(10 prod), customer(10 customers), channel, & version dimension Product, customer & version list has selective access enabled. I want to create workflow for single quarter, Step 1) Assigner workflow to planner , he will plan everything in top grid and…
-
SOS : A modeling question
Hello Everybody , I have two lists in Anaplan , let's name them countries with all the countries in it and a second list called products with all the products that a company have. I want to give the possibilty for the user if he check a country , he will see only the products in his country. So my question how we can do…
-
Multiple revision tags
Hi All, We can create multiple revision tags in the dev model for specific changes & while performing sync with PROD, these revision tags gets highlighted, however if I select the latest revision tag "add6" - all changes incl. changes specified under "add4" also gets updated. I believe revision tags works cumulatively, if…
-
Convert date to time format
I want to calculate the # of days in a month without using the PERIOD function. No time scale for this module. E.g. 10/15/2015