-
How to integrate Azure blob and Anaplan For transferring files
Is there way to connect azure blob and Anaplan to upload/import data can it done by rest api call or can i use custom script to call Anaplan connect import hub from azure??
-
Anaplan usefulness over others
Hi Friends, We can perform What if analysis in Tableau. So can't we directly import data from SAP and perform better data visualization there? Tableau also can do Budgeting & Forecasting. Why do we need Anaplan in between?
-
ALM sync
Hi Friends, I need a help. I have Dev & Prod models synchronised. Now if the Prod model is removed into a new workspace will the sync be lost?
-
Integration issue- the last line is split across two files (chunk 1 and chunk 2)
Hi Team, while calling through API for export for integration, if the file size is large, it is divided into chunks of 10MB each (e.g. if the file size is 890 MB, it will be divided into 89 chunks). As a result, we are getting incomplete record on the last row of every chunk and the rest of the records are being stored in…
-
DigitalCPX 2020: A New Way to Plan: The Anaplan User Experience | Planning and Reporting Experiences
Carrying on the conversation from this morning's Product Xperience Chat about the planning and reporting experience, please post your questions for the Product Managers in the forum below.
-
how to add Export Qlik Extract into an existing report
Hello guys. Can anybody help me to go through this? I need to add * Export Qlik Extract into an existing report thank you.
-
What is Excel Add in?
Hi Friends, By using Excel Add In, can we do only data update in Module & Lists? Or can we update formulas as well?
-
1.3.3.1 ERROR WHILE IMPORTING REGION DATA
Hi, I'm trying to import region data into a flat file in the given L2 data hub model. while doing so I'm getting some error saying "Invalid Code". I have attached the screenshot of source data and all the steps for the same. Any help in this regard would be helpful. Moreover, I want to understand when my source data has 2…
-
Multiple file upload prompts in a proces
Hi, I have a process published on a dashboard as an action. My process includes multiple actions that use the same csv file for various uploads. When I run this action I am promoted to upload the file more than once for each of the actions in the process. Is there a way to change this to prompt me to upload the file only…
-
64 bit Office
Our company recently upgraded to Office 365 64 bit version. Before upgrading the 32 bit version of the Anaplan Excel plug in was removed from the computers. After the upgrade, I downloaded the 64 bit Anaplan Excel plug in to install on the user's computers. Each time the install fails, saying "Install ended prematurely,…
-
Excel Add 3.4
What are some common causes for worksheets losing connections to Anaplan? Users have built workbooks that have included excel add in workssheets that then linked to summary works that worked fine for a time and then the user returned to the workbook and then Excel Add-In worksheet was no longer connected to Anaplan? One…
-
G lists view is not similar to the output screenshot given in the training module.
As the system modules' saved views e.g. SYS005 saved views are generally created by the available data in the module. While importing data in the module most of the data is not getting imported or the file itself is not complete or blank. Therefore, my saved views' data is also blank, resulting a blank G lists. Moreover,…
-
Duplicate Data values
Hi Friends, Q1] What do we need to do, to avoid duplicate data being entered in Data Hub? Q2] Can we write any formula in Data Hub for concatenation, to increase performance? Does Data Hub supports formula or calculation?
-
Data Hub Optimize
Hi Friends, If the Data Hub size is huge, how can I optimize it? As it is taking a lot of time to get data imported into Modules. Regards,
-
Level 1 - Lesson 8.2.2 Add Volume Inputs and Lesson 8.5.3 Import Data into Volume Inputs Module
Hi I have just imported data into the REV02 Volume Inputs Module. My import of data went through correctly, I have attached a screenshot of what the data looks like in my module. As you can see the pages are Location and Product and the line item is Volume. My concern is in the lesson 8.5.3 the picture of the imported data…
-
Anaplan level 1 non employee expenses upload
I am unable to import data to non employee expense module .Not getting option to map manually. Please see the attached files and guide
-
Excel Add In 3.0 Formula Wipeout
I've recently been having an issue with the Excel-Add In wiping out all my formulas outside of the refreshed data range. Typically when I have refreshed the tab from Anaplan I can update my anaplan filter and refresh the data without any data or formula loss as long as it's outside the range of the refreshed cells. Any…
-
how to start predictive insights
Hello. I watched the content about predictive Insights at first time. I'm interested in it , but how to start it. In the capture, how can we reach the market button?
-
Print as wysiwyg
What you see is what you get (wysiwyg) is a common feature in most reporting tools and a fair request. Currently when we try to export through classic or new UX (as PDF), what we get is far from what we see. This greatly reduces the application of some of our modules as we cannot create PDFs and forward it to higher ups…
-
Anaplan Data Integration with Hyperion
Has anyone tried to set up a data integration between Hyperion and Anaplan? I've read a bit about the Enterprise Cloud Accelerator from Wipro, but was wondering if anyone had some experiences with either this tool or another route. Our Anaplan is integrated with a number of different tools using a combination of the API…
-
NUX: Model to Model Import Actions Show Incorrect Results
Backdrop: I have a process containing an import action from data hub to spoke model that populates spoke model list members. Let's say there are 5 members in my spoke model list and there are currently no changes in my source data. Given there are no changes in data, a. The import process when run from 'Actions' tab shows…
-
New UX needs to have a multi-lingual user interface to allow non-english language implementations
Hi Anaplan, The New UX does not currently support a multi-lingual interface. Many of our clients are asking for this to be implemented. It would be really beneficial for many Anaplan Users across the world (Europe, Asia, Africa, South America) for the new UX and UI to support a multi-lingual interface. Great idea suggested…
-
AN EXISTING REPORT TO QLIK
Hello Guys. Is here anybody who can help me to sort this out? I have to add an existing report to a Qlik. Thank you.
-
Level 1 Lesson 7.2
Hi I have imported Employee.csv file into Employees Details module but with errors. The date in the csv file does not match the module date format. Because this is a training course for ANZ I am not sure whether I change the csv.file date format or the date format in the module. I have attached a screenshot of the error…
-
Print Modules/Dashboards Directly from Anaplan
My users want to be able to print directly from Anaplan (without exporting).
-
How to use Third Party Certificates with Anaplan Guide - Needs to be Updated
Hi all, I wanted to say thank you for all of the wonderful documentation around CA Certificates and data integration in general. While working through the following guide I noticed something that needed to be updated. This relates to the Sectigo certificate recommended in the guide below. The screenshot below states that…
-
Data import vs named list with hierarchy
Hi, i fance the problem during the data import - once i want to copy data from one line item to another in the same module i get duplicate values in some fields. After some investigation i realized that on my one dimension (named hierarchy list) i have the same name of member but on different level ex. Level4 - Duties and…
-
Excel Add-in Q&A —with Master Anaplanner Sonal Tripathi
We're back this month with more from Master Anaplanner Sonal Tripathi, talking about the how the Excel Add-in was helpful in solving two key problems for admins and end users. From saving time to running sanity checks, Sonal's team recognizes some key benefits of the Add-in and is already considering more opportunities in…
-
Imports and import data sources as production data
This article explains the different scenarios and the implications of marking imports and import data sources as production data. Before we begin, let's define production data. In the simplest terms, production data is data or artifacts that can be changed directly in a production environment without pushing the change via…
-
Comparison chart for anaplan connect vs other ETL/integration tools
HI Team, We have integrated from SAP to Anaplan using CPI (SAP cloud platform ) and and the integration is robust . Also we had explored anaplan connect when we started the project . We have been hearing that some of the functionalities like retry is available in connect .. I would like to see a Comparison chart for…