Is it possible to bring back the model that was deleted by mistake?
Is it possible to bring back the model that was deleted by mistake from the Manage models screen. Is there a way to restore it?
-
Anaplan Optimizer across time v2
Dear Community, I want to use the Anaplan Optimizer to optimize planning/capacity utilization across our supply chain. Got inspired by this link which shows that the Optimizer can in fact take time into account: https://community.anaplan.com/t5/On-Demand-Courses/Optimizer-Dynamic-Time-Setup/ta-p/74604 My challenge is that…
-
Product/Country Hierarchy list
Hi I have a list of Products that has its own Parent (Product Brand). Also I have a Country list with Region as Parent. Some of the Products correspond to certain countries, and some of them to more than one country: Product A (Brand A) -> Country 1 Product B (Brand A) -> Country 1 Product C (Brand B) -> Country 1 Product…
-
How can I make this LI go over time
Hi, I'm having trouble making this LI be spread over time. What is the best way to go about this? Thank you
-
IF statement with different hierarchies
Below, I have this module dimensioned by O2 Department (Level 2 in the hierarchy) and another list. My IF statement always returns FALSE when I have some start dates that do match the first day of the month. DAT03 New Hire Details is dimensioned by New Hires (Level 4 in the hierarchy). I believe I have a hierarchy issue…
-
Dynamically show list items in drop down based on a condition
Hi Team, Please refer the image below. The above image shows two grids on the page. Both have same list dimension. I need to build a logic that dynamically changes the items in drop down in the right grid's line item(list formatted called 'Stage') based in the status shown in the left grid item(list formatted called…
-
Level mismatch on common dimension
I know this question has been asked many times already but I'm not following the solutions without my own example. I'm getting this error with the following modules and dimensions. TARGET: To add "Total Hires" to the Headcount and Expenses module dimensioned by Employee and Pay Type SOURCE: Total Future Hires in the New…
-
Check item present in list and return TRUE or FALSE
Hi Team, I am planning to compare list item from LIST A with lineitem Assignment code (text format) in same module. if item present in list A boolean line item in same module will return true else FALSE List A contain assignment code as follow: How can I achieve this? Please help. Thanks JJ
-
Conditional Parenting
Hi all, I've got this situation where my region hierarchy is dependent not just on country but by the entity under which a sale is made. The table below is how I'd like the parenting to work. Region L3 entries then map on a 1:1 basis to Region L2 and again to L1. The entity specific region may roll up along with the…
-
Financial Planning
Is there any model by which i can learn financial forecasting Thanks In advance
-
Planning whole units by a curve
Hi. We have a requirement, in which the customer wants to plan a given number of units to be sold by a monthly curve, in which you only have to plan whole units, i.e I have 45 units and the % of the curve in Jan 23 is 3.45%, so the units to be planned in Jan 23 should be 2 instead of 1.55 (the result of multiplying 45 *…
-
Anaplan Optimizer across time
Hello everyone, Want to use the Anaplan Optimizer across time, and have found out that I can not use a line item running on the native time scale in Anaplan. Hence I am on the quest to create a list of the months and have been following this…
-
level 2 sprint 1
Hi, i have completed Level 2 sprint 1 exam first attempt score : 60% second attempt score is 90% , but the score is not updated and i am not able to access sprint 2 can anyone help me
-
Anaplan Level 2 Conclusion - Create Demand Export Module and Create a Saved View
Can someone help me why I am getting different demand number pulled up? Instruction: My Anaplan Blueprint Mode: My data Check your Work:
-
Calculating the Average Per Cash Curve
Hi, I'm trying to Calculate what my average would be in a certain month using a rate curve. My rate curves are inputs that are located in a inputs module and I believe I would need to multiply them by my average to see what the average would be over time. The only issue I'm having is that my input modules with the rate…
-
Need Calc Help
Hi Community, I am working on this use case. Wondering if this is possible. DAT01 Emp Details Emp | Start Rate EmpA 15 EmpB 16 EmpC 17 SYS02 Zone Module Zone| Lower Range | Upper Range ZoneA 14 15 Zone B 15 16 Zone C 17 100 How can I identify which Zone does an employee falls in. Final result needed Emp | Zone EmpA Zone A…
-
Calculate headcount by time
I'm having issues counting the current headcount by month. I have employee hire date, leave date, and projected leave date. I've attached snap shots of my modules. I haven't figured out how to include "projected leave date" into my formula yet. I'm stuck on trying to get the current employees based on historical leave date…
-
Level 2 Sprint 1 List Import Errors
When I imported flat files for Sprint 1 1.3 I did not include a parent as instructed, so my country list has only a code, and my location list likewise (see image). However, when I then import this list into G2 Country, it now has no parent listed under region. When I try to write a PARENT(ITEM(___)) formula, I receive…
-
Import is not working with saved view contains 6 dimensions or Lists
Hi, I am trying to copy the one line item data to another line item within same module by using an import action from saved view(Source) to module(Target) and it is not working in expected way.. Module and saved view have 6 dimensions or lists, due to this i could not bring all these lists into Rows section of pivot option…
-
Our Anaplan is SSO based Signon, I would like to know how we can identify Non SSO Roles
Hello, Our Anaplan is SSO based Single Sign on and I would like to know how I can identify roles that support non sso sign on. Thanks Madhu