-
A conversation with Ikhwan Ryan Aditantra — Journey | Anaplan Community Podcast
Join host Kas Gengadaren (@KasG), Anaplan’s APAC Ecosystem Manager, for our thirteenth episode of Journey, an Anaplan Community podcast. In this episode, she chats with Ryan Aditantra, Certified Model Builder and Assistant to CFO at PT Pertamina. Ryan has been with PT Pertamina for over ten years in various roles. PT…
-
Optimizer Problem: Line Production Allocation by Production Plan
Hi All , I am having issues using the optimizer for production allocation. The model is for capacity planning. Problem statement Need to allocate the SKU demand to compatible factory lines based on the following logic. Each SKU has a production priority and a factory line priority. If the production priority for a SKU is 1…
-
Charts & Graphs - The ability to set axis/axes as a Log Scale/Logarithmic Scale
There is currently limited functionality in terms of setting axes formats in Anaplan. As part of increased functionality, it would be great to be able to set an axis as a log scale as in the example attached.
-
Experiencing Occasional 'Basic Authentication Failed' errors under SSO
We recently switched majority of our workspaces over from Basic Authentication to SSO for security. To populate our models with data that is rapidly changing we push data through our internal data store through an ETL (Workiva formerly known as OneCloud) hourly sometimes more often than that. There is a dedicated service…
-
Rolling Forecast Chart
Hello, Is there a way I can create a line chart that connects the Actual data and the Forecast? Attached is the screenshot from Excel that I plan to create in Anaplan. Thanks, Tom
-
Links in page tasks in a workflow are not working
Hi all, I have a problem: in a workflow I use a page that contains links. Before when starting a task that takes you to that page you could navigate from those links. Now, the page is "static" and the links do not work when you are in the task page. Is something new? Can it be changed?
-
NMX - Open App in new window
As a model builder and UX designer I would like to be able to open an App directly from the pages section of the NMX When I want to create new pages or review their order it is useful to review the current app(s) before proceeding. If a link to the relevant app for each page could be added to the NMX pages section this…
-
Model history to include exports
At present the model history only shows imports and actions within the model. We have recently had issues with exports piling up in the queue and locking users out of the system. Right now there is no way for WSAs to determine who/what occurred without reaching out to Anaplan Support to investigate. It would be nice if…
-
Ability to input text commentary with text formatting options in Management Reporting - New UX
While working on a project, a useful implementation emerged. Currently in Anaplan, via Management Reporting, it is possible to create documentation that cannot be customised by the user. In fact, the end user using the system can only look at the data and comments previously entered by the Page Builder. We tried creating a…
-
automatically include quarters and months when adding a new fiscal year
Hi everyone, I'm working with Anaplan and have encountered an issue with my setup. I've created a list with a parent-child relationship: Fiscal Year > Quarter > Month. However, I'm having trouble ensuring that each year contains the same information for months and quarters. When I add a new year, I can't parent the months…
-
Ability to apply filter on page selector in management reporting
It would be beneficial to have filter on context /page selector in management reporting slides
-
Clear an entire module
Scenario: If I am importing data into a module and a line item no longer exists in the source file, the Clear Before Import will not clear that line item as it will only clear line items that are coming in from the file. This can lead to numbers being off. Current workaround: Create a duplicate module that is filled with…
-
Boolean Filter
This module consists of E2 Employee# list and 2 line items, one is to filter out the employee whose department needed to be changed. When I applied the filter and enable it all the unchecked line Items vanished. what I need is, when all is unchecked the list should appear and when one list member is checked it should…
-
How I Built It: Data locking and validation within processes
Author: Noah Jackson is a Certified Master Anaplanner and Principal Data and Insights Architect at Anaplan. Hello Anaplan Community! I’m excited to share this ‘How I Built It’ video with you. In this tutorial, I walk you through two types of actions that you can add to your Anaplan processes to improve your data access…
-
Filter Context
Does anyone know would drive filtering to require "Filter Context"? If I select a list item, it will cause problems if another user wants to select an alternate "Entity" in my example. It seems like you hard code the "Entity" by selecting something in the "Context Filter."
-
Move line items from one module to another (along with formula reference)
Hi team, Looking to tidy up some modules in a model I manage. I have noticed there is 2 different system modules each housing different time variables. I have asked around and the consensus was the second module was made to keep track of the variables when building out further functionality in the module that the builder…
-
Allow the User Admin Role Permission to Export Assignments
Currently, only a Tenant Admin can click the Export button to export the list of users with Administration level roles. The User Admin Role should also be able to export this user list.
-
Summaries of properties within numbered lists
Hi, We have a numbered list for sites , and within this numbered list, we have a property of regions). Regions sit above sites (E.g., Manchester consists of Site A, Site B, Site C). We want to be able to see this from a region basis. I was wondering if there is a standardised approach to getting this summarization? Thanks…
-
Challenges with Continuing to Use Version 1.3 API in Power Automate Custom Connectors
I'm currently using Version 1.3 of the API in Power Automate Custom Connectors, but our Anaplan systems have been upgraded to Version 2.0. I have a few concerns and I’m hoping to get some insights from this community: Compatibility and Functionality: Are there any known issues with maintaining the older API version in…
-
How to provide integration access to a user
I am tenant admin and I want to give integration access to one of the user, can anyone help me with how can I provide that access to a user.
-
Issue with personnel filters in user page
Hello All, I am sorry if my question isn't smart 🙈 I have a problem with the filters added in this user page (on the right), i see all filters from other users, i know it's possible to keep only my own choices for those filters, but i don't remember how to fix it. Thanks in advance for your answers,
-
Add XOR formula
Title says it all, a XOR formula would be really helpful and reduce formula length when trying to test an exclusive or. For those unfamiliar, here is the logic table for XOR. It acts as an OR however if both inputs are TRUE, then XOR returns false.
-
Shorthand Typing for Thousands, Millions and Billions Input
As a read/write user of an app, I want to type large numbers with as little keyboard strokes possible, so that I am sure my input is accurate (limit finger errors) and that I save time and get through my workload efficiently. I'll know this is successful when I can type k for thousands, m for millions and b for billions…
-
Can I add in Cloudworks a Delete Process using Selection?
Hello, I want to do the dete function automaticly with Cloudworks. Can I do it with slelection? if Not, what options do I have? thanks
-
Using Optimizer for production line allocation
Hi, I am having issues using the optimizer for production allocation. The model is for capacity planning. Problem statement Need to allocate the SKU demand to compatible factory lines based on the following logic. Each SKU has a production priority and a factory line priority. * If the production priority for a SKU is 1…
-
Activity: Prepare Data Exports: Create Demand Export Module and Create a Saved View
Hello, I am doing this activity and below is the request for the activity. and this is how it should look like. Now, below the thing what I have created. but I am not getting the correct output as shown in the Anaplan Training document. So, can anyone help me to understand what I am doing wrong here? Thanks !!
-
Summary Reporting
We currently have our model set up in the hierarchy ‘Shop > Customer > Products for volume planning. Currently, users can see their total volumes on a ‘Shop basis, with them being able to go down to see volume on a customer and material level under the shop. How would we go about creating customer summary reports, where…
-
Building a Center of Excellence
Overview Standing up a Center of Excellence is complex. There are many decisions to be made. Here are some of the materials to help get a basic understanding of building a CoE that are part of our CoE Success Accelerator Workshop. What is a Success Accelerator Workshop? Anaplan offers targeted workshops, Success…
-
Using LOOKUP and SUM with Formula summary method
A detailed description of the enhancement that is being requested. We would like to request an enhancement that would allow to use LOOKUP and SUM with Formula summary method. Currently Anaplan doesn’t allow to do so, although in many cases it is needed and doesn’t break the math. If available, could you please provide a…
-
Looking for AppHub users to participate in a user research study
Anaplan's User Experience Research team is looking for model builders with experience using the App Hub to participate in an upcoming research study. In this study, you will discuss your experiences with App Hub and Partner Based Solutions. This study will take place between February 7th and February 11th, and the sessions…